How to Delete a Scheduled Compliance Report

1.    Access the Compliance module.

2.    In the Compliance Projects section, click the List Projects option.

3.    In the List of Projects section, click Edit next to the project containing the report schedule you want to delete.

4.    Click the Analysis tab.

5.    Click Reports.

6.    Click the Scheduled Reports tab.

 

The system displays the list of all the compliance reports scheduled in the project.

 

7.    To delete a schedule, mark the checkbox next to the schedule you want to delete and click Delete Schedule (see figure below).

 

The system requests confirmation of the deletion (see figure below).

 

 

8.    Click Delete Schedule to confirm. If you want to quit the operation, click Cancel.

 

The system displays a success message.