1. Create a second chart by following the steps in the topics above. By default, the first chart you created will be behind or under the second chart.
2. With the first chart still selected, click Bring Forward on the Design tab.
3. If you no longer have the first chart selected and it’s now completely covered by the second chart, just select the second chart and click Send Backward on the Design tab.